In the course of dry rot and paint project, the contractor identified a number of balconies which showed significant structural wood deterioration. These decks were not part of the scope of the project, but more importantly, required engineering analysis and preparation of architectural drawings before repairs could be performed. Richard Avelar, the architects supervising the current repair project are preparing the drawings and we anticipate that this project will begin, weather permitting, in early 2017. In the interim, the decks have been shored up for safety.

Until repairs or reconstruction of these decks can be performed, it is recommended that residents refrain from using these decks (see memo from Richard Avelar & Associates).